A moment to believe. A tradition to keep.

Discover Collection

Products

The First Letter from Santa Claus

The First Letter from Santa Claus

The First Letter from Santa Claus

Subscribe to our newsletter to be the first to know when they go live

$48.00 USD
Tooth Fairy Letter: The First Letter

Tooth Fairy Letter: The First Letter

Tooth Fairy Letter: The First Letter

An enchanting introduction to the magic of the Tooth Fairy

$48.00 USD
Tooth Fairy Letter: Write Your Own

Tooth Fairy Letter: Write Your Own

Tooth Fairy Letter: Write Your Own

Your words, our magic: a letter only you could write

$48.00 USD
Tooth Fairy: Bravery

Tooth Fairy: Bravery

Tooth Fairy: Bravery

For the child who chose bravery to overcome a fear

$48.00 USD
Tooth Fairy: Difficult time

Tooth Fairy: Difficult time

Tooth Fairy: Difficult time

For the child who needs to know they are not alone

$48.00 USD
Tooth Fairy: Facing Change

Tooth Fairy: Facing Change

Tooth Fairy: Facing Change

For a child facing change with a reminder that this feeling is temporary

$48.00 USD
Tooth Fairy: Milestone

Tooth Fairy: Milestone

Tooth Fairy: Milestone

For celebrating the moments that make them shine

$48.00 USD

How to design your letter

Step Image 1
1

Choose your letter theme

Every child’s journey is different, and so is the magic they need. Rather than a generic text, our letters are written to help navigate different seasons of childhood. Browse our collection of specific themes and choose the story that best reflects their current world. Whether they are navigating change, being brave, or simply excited about their very first wobbly tooth, the right letter is waiting for them.

Step Image 2
2

Select your font and color

Choose the subtle details that will make this keepsake uniquely theirs. Select between our signature sage green or classic saphhire blue envelopes, and choose between 2 elegant font style that sets the tone for their story. Every visual element is designed to feel timeless.

Step Image 3
3

Personalize the letter

This is where the true magic takes shape. Before adding to your cart, you will be asked to share a few specific details with us, such as a recent triumph, the name of a beloved pet, or a specific moment of bravery. We seamlessly weave these personal touches into the narrative, ensuring that when your child reads the letter, they know without a doubt that it was written exclusively for them.

Step Image 4
4

We craft with care

Your story is formatted by hand in our studio. Each letter is thoughtfully designed and printed on luxurious paper, featuring elegant gold foil detailing, handmade pressed wax seals, and delicate ribbons. Finished with our exclusive in-house designed stamps, every element is chosen to create a beautiful, heirloom-quality piece your family will treasure.

Step Image 5
5

Receive your letter

Your order arrives beautifully in discreet packaging. Inside you will find a heartfelt, personalized letter, written as if it truly came from the Tooth Fairy. All that remains is for you to slip the envelope under their pillow or rest it somewhere safe after they fall asleep, and wait to witness the absolute wonder in their eyes the following morning.

We believe in the importance of childhood magic. That's why we choose luxury quality materials. Every letter is individually formatted, printed on premium paper, and assembled by hand in our studio.

Personalized for your child

Your child's name and home description on the envelope.

Your child's name on the letter.

A recent accomplishment or milestone and the values it represents.

The family representation and/or names.

The description of your home.

A "P.S. Message" to write down anything else that you might have wanted to mention.

A magical memory for them and you.

Bestseller

Discover the Tooth Fairy's Universe

We designed the letters to feel exactly like the Tooth Fairy’s first or ongoing correspondence. Full of wonder, warmth, and a touch of childhood enchantment.

You do not need to worry about the timing. Whether this is their very first wobbly tooth or their fifth, our stories are written to seamlessly fit wherever your child is in their journey with the Tooth Fairy. Each letter beautifully reflects a continuous, natural bond.

Discover Collection

Moments to believe

We create space for wonder. Every letter is an invitation to believe in magic, in childhood, and in the quiet power of imagination. We want you and your family to hold onto that beautiful belief a little longer.

Traditions to keep

The most cherished traditions are not always loud. They are found in quiet, repeated acts of love. Our letters are crafted to become one of those gentle traditions; something your family will return to, year after year.

Lifetime of memories

Some moments are too precious to let slip away. We turn the small, fleeting experiences of childhood into beautiful keepsakes that can be opened again and again, carrying the same wonder forward through time.